Slide method - List of Manufacturers, Suppliers, Companies and Products

Slide method Product List

1~3 item / All 3 items

Displayed results

New construction work - Sliding method (Sliding/Slip form method)

Shortened construction period! This is a method that raises the work floor along with the jack.

The slide construction method involves attaching formwork and internal and external working platforms to a frame made of steel (such as H-beams) called a yoke, and then using jacks to raise the working platforms along with steel rods embedded in concrete as reaction forces. The working platforms are constructed in three tiers—upper, middle, and lower—according to the work requirements, with rebar reinforcement, concrete pouring, and plaster finishing both inside and outside. Additionally, if the roof of structures like silos is made of steel, connecting the steel parts to the yoke and raising them simultaneously makes it easier to maintain verticality and roundness, eliminates the need for steel frame erection, and enhances safety. **Features** - The biggest feature of the slide construction method is the reduction of construction time. - Concrete pouring can be done daily after the assembly of the equipment is completed. - It is ideal for super-tall chimneys (H=100-200m) and sites with no construction time constraints. - Continuous concrete pouring minimizes joints. - It is also beneficial in terms of quality. For more details, please contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-altitude slide construction method

It is a full casing (full rotary) method that enables work up to a depth of 4.4 meters.

We have made it possible to carry out construction that was previously impossible. - Foundation work inside the gymnasium: Previously, part of the wall had to be demolished to bring in machinery, but it is now possible to bring in equipment without altering the current state. - Foundation work along the railway: Work that requires crane booms to extend higher than the tracks is typically done at night, but since we do not use cranes, daytime work is possible. - Bridge widening and under-beam work: Heavy machinery can access the existing under-beam area, allowing vehicles to continue using the existing bridge during construction. - Work under high-voltage power lines: Construction under high-voltage power lines is also feasible.

  • Foundation construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Multi-slide method

Installation method for products at sites where large vehicles and heavy machinery cannot enter.

【NETIS CB-060014-A】 This is a construction method for installing secondary products such as box culverts, free gradient ditches, and L-shaped retaining walls in mountainous areas and urban areas where large vehicles and heavy machinery cannot enter. It involves installing rails (steel materials) and steel balls, over which products mounted on sleds (steel materials) slide. Manual installation is also possible depending on the weight of the products.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration